Maintenance – Hale 5.0 FoamLogix User Manual
Page 109
![background image](/manuals/545157/109/background.png)
IV
-15
ROTARY GEAR PUMP
ELECTRONIC FOAM PROPORTIONING SYSTEM
Section
IV
: Operation
MAINTENANCE
MAINTENANCE PROCEDURES
1. After each use: Flush Hale FoamLogix
foam pump if Class B foam concentrate
was used and return to Class A.
2. After each use: Inspect wiring, hoses,
flowsensors, and connections for
tightness, corrosion, leaks and/or
damage. Refer to installation drawings.
3. After each use: Remove and clean the
foam strainer screen(s). Flush as
required.
4. Monthly: Verify water flow calibration.
5. Monthly: Verify foam feedback
calibration.
This manual is related to the following products: