beautypg.com

16 decommissioning – SMA SC 500CP-10-JP Installation Manual User Manual

Page 79

background image

SMA Solar Technology AG

16  Decommissioning

Installation Manual

SCCP-JP-IA-A4-en-12

79

16 Decommissioning

1. Disconnect the Sunny Central from all voltage sources (see Section 14, page 69).
2. Disassemble the panels (see Section 8.3, page 37).
3. Decommission the DC main distribution (see DC main distribution documentation).
4. Decommission the DC sub-distributions (see DC sub-distribution documentation).
5. Disconnect the AC and DC cabling in the Sunny Central.
6. Mount the panels (see Section 15.10).
7. Close the door of the interface cabinet.