SMA SC 500CP-10-JP Installation Manual User Manual
SMA Equipment
Table of contents
Document Outline
- 1 Information on this Document
- 2 Safety
- 3 Product Description
- 4 Scope of Delivery
- 5 Storage
- 6 Preparation for Installation
- 6.1 Selecting a Mounting Location
- 6.1.1 Requirements for the Mounting Location
- 6.1.2 Dimensions of a Sunny Central
- 6.1.3 Minimum Clearances for Outdoor Installation
- 6.1.4 Minimum Clearances for Installation in Electrical Equipment Rooms
- 6.1.5 Requirements for Foundation and Cable Arrangement
- 6.1.6 Requirements for Cable Routing between MV Transformer and Sunny Central
- 6.2 Preparation for Mounting without Base
- 6.3 Preparation for Mounting on a Base
- 6.1 Selecting a Mounting Location
- 7 Transporting the Sunny Central
- 7.1 Safety during Transport
- 7.2 Center of Gravity of the Sunny Central
- 7.3 Mounting the Kick Plates at the Rear of the Sunny Central
- 7.4 Transporting the Sunny Central Using a Crane Fork
- 7.5 Transporting the Sunny Central Using a Forklift
- 7.6 Transporting the Sunny Central Using a Pallet Truck
- 7.7 Transporting the Sunny Central Using a Crane
- 8 Installing the Sunny Central
- 8.1 Attaching the Sunny Central without Base
- 8.2 Installing the Sunny Central on a Base
- 8.3 Disassembling the Panels on the Connection Area
- 8.4 Removing the Transport Lock from the Inverter Cabinet
- 8.5 Mounting the Silencing Baffle
- 8.6 Replacing the Desiccant Bag in the Inverter Cabinet
- 8.7 Mounting the Ventilation Plate
- 9 Grounding Terminal
- 10 DC Connection
- 11 AC Connection
- 12 Cable Connection of External Devices and Connections in the Interface Cabinet
- 12.1 Connection Area
- 12.2 Leading the Cables into the Interface Cabinet
- 12.3 Connecting the Cables in the Interface Cabinet
- 12.3.1 Connecting the Cables to the Connecting Terminal Plate
- 12.3.2 Connecting the Data Cables of the Sunny String-Monitor
- 12.3.3 Connecting the Remote Shutdown
- 12.3.4 Connecting the External Setpoint Specification
- 12.3.5 Connecting the Transformer Monitoring
- 12.3.6 Connecting the External Supply Voltage
- 12.3.7 Connecting the External Fast Stop Cabling
- 12.3.8 Connecting the Cable for Querying the Inverter Status
- 13 Setting up a System Network
- 14 Disconnecting the Sunny Central
- 15 Commissioning
- 15.1 Sequence of Commissioning
- 15.2 Checking the Sunny Central Cabling
- 15.3 Inserting Fuses and Disconnection Blades
- 15.4 Mounting the Protective Covers
- 15.5 Checking the Voltages on the Sunny Central
- 15.6 Checking Grid Monitoring
- 15.7 Important Measures in Case of Non-Utilized Options
- 15.8 Switching On the Voltage Supply and the AC Circuit Breaker
- 15.9 Mounting the Panels
- 15.10 Switching On the Sunny Central
- 16 Decommissioning
- 17 Technical Data
- 18 Contact