6  Preparation for Installation

SMA Solar Technology AG

20

SCCP-JP-IA-A4-en-12

Installation Manual

6 Preparation for Installation

6.1 Selecting a Mounting Location

6.1.1 Requirements for the Mounting Location

Requirements:

☐ If the Sunny Central is to be installed in an electrical equipment room, an adequate supply of fresh air must be

ensured. If this is not the case, an additional ventilation system must be installed, e.g an external fan.

☐ The mounting location must be freely accessible at all times.
☐ The mounting location must be below the maximum installation altitude (see Section 17 "Technical Data", page 80).
☐ The ambient temperature must be within the operating temperature range (see Section 17 "Technical Data",

page 80).

☐ The mounting location must meet the requirements on ambient conditions (see the Technical Information "Installation

Requirements - Important Information on Transportation and Installation for Sunny Central 500CP-JP/630CP-JP/

800CP-JP").

6.1.2 Dimensions of a Sunny Central

Dimensions of a Sunny Central for Outdoor Installation

Figure 5: Dimensions with roof

Orientation of the inverter for protection against noise
The front side of the inverter with the supply air opening is louder during operation than the rear side. Especially in

residential areas, the inverter should be oriented with the rear side facing the residential area.