2 preparation for mounting without base, 2 drilling mounting holes in the foundation, 3 preparation for mounting on a base – SMA SC 500CP-10-JP Installation Manual User Manual
Page 28

6 Preparation for Installation
SMA Solar Technology AG
28
SCCP-JP-IA-A4-en-12
Installation Manual
6.2 Preparation for Mounting without Base
6.2.1 Position of the Mounting Holes on the Sunny Central
The fixtures in the support surface can be prepared prior to installing the Sunny Central.
The Sunny Central must be attached to the support surface by means of six screws. Mounting holes for attaching the
inverter to the foundation or the base are located in the inverter floor.
Figure 14: Position of the mounting brackets on the Sunny Central
6.2.2 Drilling Mounting Holes in the Foundation
1. Mark the positions of the mounting holes on the foundation corresponding to the mounting brackets.
2. Drill mounting holes at the marked positions.
6.3 Preparation for Mounting on a Base
Requirements:
☐ Excavation pit and subgrade must be prepared for mounting the base (see the Technical Information "Installation
requirements - Important information on transportation and installation for Sunny Central 500CP-JP ⁄ 630CP-JP /
800CP-JP").
☐ The base must be installed.
Procedure:
1. Lead the AC, DC and data cables through the opening into the base. Route the data cables separately from AC and
DC cables.
2. Seal the opening, e.g. with expanding foam. This will prevent animals from penetrating the Sunny Central.
3. Fill up the excavation pit and level off to ground level.
Position
Designation
A
Mounting holes for mounting on a base or foundation
B
Mounting holes for mounting on base
C
Mounting holes for mounting on a foundation