beautypg.com

Setting user preferences, Using scheduall's developer's toolkit – Grass Valley Aurora Ingest v.6.5.2 User Manual

Page 97

background image

9. Click

Add

.

10. In the

Category

column, select

Aurora

.

11. In the

Type

column, double-click

Channel

.

12. Select the Channel resource added in Step 11.

13. Click

Edit

. The Resource to Auto-Include dialog displays.

14. Select

User Select

and click

OK

.

15. Click the

Capable Rooms

tab.

16. Click

Add to List

.

17. From the

Category

column, select

Rooms

.

18. From the

Type

column, select

Ingest

.

19. In the

Description

column, select

Aurora Ingest

and click

Select

.

20. Click

OK

.

Setting User Preferences

Users can set user preferences when using ScheduALL.

1. From the

File

menu, select

User Preferences

, then select

General

.

2. Click the

Options

tab.

3. Locate the Force Service Selection on Work Order Creation entry.

4. Click the

Value

column and select

Yes

.

5. Locate the Force Client Selection on Work Order Creation entry.

6. Click the

Value

column and select

Yes

.

7. Click

OK

.

Adding Controls and Browsers to Dialogs in ScheduALL

To configure ScheduALL for use with Aurora Ingest, several controls and a resource
browser need to be added to the Work Order form using the Developer's Toolkit. These
controls and the resource browser can be placed on a new tab or an existing tab on the
Work Order form.

Scheduling events from ScheduALL into Scheduler will not be sucessful if these
controls and resource browser are not added into the Work Order form.

Using ScheduALL's Developer's Toolkit

You need to use the Developer's Toolkit in order to add controls and resource browser
to the Work Order form.

1. Log in to the ScheduALL system as a supervisor or with permissions to the

Developer's Toolkit Module.

13 August2009

Aurora Ingest System Guide

97

Configuring Aurora Ingest

This manual is related to the following products: