Echelon Lumewave CRD 3000 Street Light Bridge User Manual
Page 99

Street Light Bridge Integrator’s Guide
89
2. The calendar view for the current date opens. Click Add or Edit Data
Points to open the Add or Edit Data Points dialog.
3. Expand the tree view for the device for which you want to add a data
point, and expand its primary functional block.
4. Select the data point to add it to the scheduler.
5. Repeat steps 3 and 4 for each data point that you want to add.
6. Optionally, you can click the Stagger Delay column to specify the period
of time (in seconds) that the Event Scheduler waits before updating the
specified data point at each schedule interval. This setting enables you to
ramp up or wind down a system. Click Submit.
7. Optionally, you can add new presets to a data point or delete existing
presets:
a. Right-click the data point and select Add/Delete Preset from the
shortcut menu.