Echelon Lumewave CRD 3000 Street Light Bridge User Manual
Page 97

Street Light Bridge Integrator’s Guide
87
6. Optionally, you can select the Restrict Effective Period checkbox to
configure the period of time for which the Event Calendar and Event
Scheduler are active, respectively. By default, both are active for a 37-
year period starting on January 1, 2000 and ending December 31, 2037.
To configure a different effective period, specify the Start Date and Stop
Date. If you clear the checkbox, the default 37-year effective period is
used.
7. By default, the Suppress Event Recovery checkbox is cleared.
Clearing this checkbox means that the Scheduler executes the next
scheduled event when the Segment Controller reboots, the system time
changes, or a data point’s priority is reset at the end of a one-time
exception. This option enables the Segment Controller to maintain the
current value stored in the data point if the data point is overridden by
another application. Selecting the checkbox allows the Scheduler to
attempts to restore the values and priorities of the selected input points
by searching for the most recent past event and executing it.
The Scheduler exclusively determines the value of each selected input
point (as long as it has the highest priority assigned to the data point).
8. Click Submit.
To open the Scheduler application from an existing Scheduler functional block,
perform the following steps:
1. Click the Scheduler functional block representing the Scheduler to be
opened. The calendar view for the Scheduler Web page opens in the
application frame to the right, as shown above.