beautypg.com

Chapter 7: maintenance, Chapter 7, 1 maintenance schedule – AERCO BMK 1.5 LN Dual Fuel Feb 2013 User Manual

Page 78: Benchmark 1.5ln dual-fuel low nox boiler, Gf-121, Chapter 7: maintenance 7.1 maintenance schedule

background image

PR2: 05/01/11 Page

78 of 162

Benchmark 1.5LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0C

GF-121

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

CHAPTER 7: MAINTENANCE

7.1 MAINTENANCE SCHEDULE

The unit requires regular routine maintenance to keep up efficiency and reliability. For best

operation and life of the unit, the following routine maintenance procedures should be performed

in the time periods specified in Table 7-1. See Appendix I for a complete CSD-1 inspection

check list.
In order to perform the maintenance tasks specified in Table 7-1, the following maintenance kits

are available through your local AERCO Sales Representative:

Annual Maintenance Kit, Part No. 58025-01

24-Month Waterside/Fireside Inspection Kit, Part No. 58025-05 (See NOTE below)

NOTE

The 24-Month Waterside/Fireside Inspection Kit also includes

the items contained in the Annual Maintenance Kit.

Therefore, only Kit Part No. 58025-05 is required when

performing the waterside/fireside inspections.

Appendix K contains recommended spare parts lists for maintenance of the boiler.

WARNING

TO AVOID PERSONAL INJURY, PRIOR TO SERVICING ENSURE

THAT THE FOLLOWING GUIDELINES ARE STRICTLY OBSERVED:

DISCONNECT THE AC SUPPLY BY TURNING OFF THE

SERVICE SWITCH AND AC SUPPLY CIRCUIT BREAKER.

SHUT OFF THE GAS SUPPLY AT THE MANUAL SHUT-OFF

VALVE PROVIDED WITH THE UNIT

ALLOW THE UNIT TO COOL TO A SAFE WATER

TEMPERATURE TO PREVENT BURNING OR SCALDING

Table 7-1: Maintenance Schedule

Paragraph

Item

6 Mos.

12 Mos.

24 Mos.

Labor

Time

7.2

Igniter-Injector (58023) *Inspect

Inspect

Replace

15 mins.

7.3

Flame Detector (66006) *Inspect

Inspect

Replace

15 mins.

7.4

Combustion Calibration

& RSI Regulator

Adjustment

*Check

Check

1 hr.

7.5

Testing of Safety

Devices

See CSD-1

Chart in

Appendix I

20 mins.

7.6

Burner

Inspect

2 hrs.

7.7

Condensate Drain Trap *Inspect

Inspect &

Clean

30 mins.

*Only performed after initial 6 month period after initial startup.