AERCO BMK 1.5 LN Dual Fuel Feb 2013 User Manual
Page 3

PR2: 05/09/12 Page
3 of 162
Benchmark 1.5LN Dual-Fuel Low NOx Boiler
Operation and Maintenance Manual
OMM-0043_0C
GF-121
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288
Table of Contents
CHAPTER 1: SAFETY PRECAUTIONS .................................................................................. 9
1.1 WARNINGS & CAUTIONS .................................................................................... 9
1.2 EMERGENCY SHUTDOWN ............................................................................... 10
1.3 PROLONGED SHUTDOWN ................................................................................ 10
CHAPTER 2: INSTALLATION .............................................................................................. 11
2.1 INTRODUCTION ................................................................................................. 11
2.2 RECEIVING THE UNIT ....................................................................................... 11
2.3 UNPACKING ....................................................................................................... 11
2.4 SITE PREPARATION. ......................................................................................... 12
Installation Clearances ............................................................................................. 12
2.4.1
Setting the Unit ........................................................................................................ 13
2.4.2
2.5 SUPPLY AND RETURN PIPING ......................................................................... 14
2.6 CONDENSATE DRAIN ........................................................................................ 14
Exhaust Manifold Condensate Drain ....................................................................... 15
2.6.1
2.7 GAS SUPPLY PIPING ......................................................................................... 16
Gas Supply Specifications. ...................................................................................... 17
2.7.1
Manual Gas Shutoff Valve ....................................................................................... 17
2.7.2
IRI Gas Train Kit ..................................................................................................... 18
2.7.3
2.8 AC ELECTRICAL POWER WIRING .................................................................... 18
Electrical Power Requirements ................................................................................ 18
2.8.1
2.9 MODES OF OPERATION AND FIELD CONTROL WIRING ............................... 19
Constant Setpoint Mode ........................................................................................... 20
2.9.1
Indoor/Outdoor Reset Mode .................................................................................... 20
2.9.2
Boiler Management System Mode ........................................................................... 20
2.9.3
Remote Setpoint and Direct Drive Modes ............................................................... 21
2.9.4
Combination Mode .................................................................................................. 21
2.9.5
2.10 I/O BOX CONNECTIONS .................................................................................. 22
Outdoor Sensor In (1) .......................................................................................... 22
2.10.1
Air Temp. Sensor (2) ........................................................................................... 23
2.10.2
Analog In (3) ........................................................................................................ 23
2.10.3
B.M.S. (PWM) In (4) .......................................................................................... 23
2.10.4
Shield (5).............................................................................................................. 23
2.10.5
mA Out (6) ........................................................................................................... 24
2.10.6
RS-485 Comm (7) ................................................................................................ 24
2.10.7
TxD, RxD (8) ....................................................................................................... 24
2.10.8
VFD/Blower (9) ................................................................................................... 24
2.10.9
Exhaust Switch In (11) ...................................................................................... 24
2.10.10