APPENDIX I: RECOMMENDED PERIODIC TESTING CHECK LIST

WARNING

NOTE: Periodic testing of all boiler controls and safety devices is required to determine that they are operating

as designed. Precautions shall be taken while tests are being performed to protect against bodily injury and

property damage. The owner or user of an automatic boiler system should set up a formal system of periodic

preventive maintenance and testing. Tests should be conducted on a regular basis and the results recorded in

a log-book.

Item

Frequency Provided By

Remarks

Refer to indicated paragraphs of this manual for detailed procedures

Gauges, monitors and

indicators

Daily

Operator Visual inspection and record readings in

operator log

Instrument and

equipment settings

Daily

Operator Visual check against factory recommended

specifications

Weekly

Operator Verify factory settings

Firing Rate Control

Semi-Annually Service Tech. Verify factory settings

Annually

Service Tech. Check with combustion calibration test

equipment. See paragraph 7.4 and Chapter 4.

Flue, vent, stack or

intake air duct

Monthly

Operator Visually inspection condition and check for

obstructions

Spark Igniter

Weekly

Operator See paragraph 7.2

Air/Fuel Valve position

Weekly

Operator Check position indicator dial (paragraph 3.9)

SSOV Leakage test

Annually

Service Tech.

Check for leakage in accordance with the

SSOV manufacturer’s (Siemens)

recommendations.

Flame failure

Weekly

Operator Close manual gas shutoff valve and check

safety shutdown. See paragraph 6.7

Flame signal strength

Weekly

Operator Check flame strength using the Control Panel

Operating Menu. See paragraph 3.4.

Low water level cut off

and alarm

Weekly

Operator See paragraph 6.6

Slow drain test

Semi-Annually Operator

Perform a slow drain test in accordance with

ASME Boiler and Pressure Vessel Code,

Section IV.

High water

temperature safety

control test

Annually

Service Tech. See paragraph 6.7

Operating controls

Annually

Operator See paragraph 3.2

Low air flow

Monthly

Operator See paragraph 6.10

High and low gas

pressure interlocks

Monthly

Operator See paragraphs 6.2 through 6.5

Air/Fuel Valve purge

position switch

Annually

Service Tech. See paragraph 6.12

Air/Fuel Valve ignition

position switch

Annually

Service Tech. See paragraph 6.13

Safety valves

As required

Operator Check per A.S.M.E. Boiler and Pressure

Vessel Code, Section IV

Inspect burner

components

Semi-Annually Service Tech. See paragraph 7.6

Condensate Trap

Semi-Annually Operator See paragraph 7.7