CHAPTER 2: INSTALLATION

PR2: 05/09/12 Page

21 of 162

Benchmark 1.5LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0C

GF-121

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

108M (BMS), GF-124 (BMS II Model 5R5-384), and GF-131 (ACS) operation manuals.

Remote Setpoint and Direct Drive Modes

2.9.4

The Benchmark 1.5 Boiler can accept several types of signal formats from an Energy

Management System (EMS), Building Automation System (BAS) or other source, to control

either the setpoint (Remote Setpoint Mode) or air/fuel valve position (Direct Drive Mode) of the

Boiler. These formats are:

4 to 20 mA/1 to 5 VDC

0 to 20 mA/0 to 5 VDC

PWM – (Pulse Width Modulated signal. See para. 2.10.4)

Network (RS485 Modbus. See para. 2.10.7)

While it is possible to control a boiler or boilers using one of the previously described modes of

operation, it may not be the method best suited for the application. Prior to selecting one of

these modes of operation, it is recommended that you consult with your local AERCO

representative or the factory for the mode of operation that will work best with your application.

For more information on wiring the 4 to 20 mA / 1to 5VDC or the 0 to 20 mA / 0 to 5 VDC, see

paragraph 2.9.3.

Combination Mode

2.9.5

NOTE

Only BMS Model 168 and ACS can be utilized for the Combination

Mode, not the BMS II (Model 5R5-384).

With a Combination Mode unit, field wiring is between the unit’s I/O Box wiring terminals, the

CCP (Combination Control Panel), and the BMS (Boiler Management System). For ACS

applications, the wiring is between the ACS panel, the ACS Relay panel (optional, depending on

applications), and the RS485 comm terminals in the I/O box. The wiring must be accomplished

using twisted-shielded pair wire from 18 to 22 AWG. Polarity must be maintained.
For further instructions and wiring diagrams, refer to the GF-108 Boiler Management System

Operations Guide and the CCP-1 data sheet (BMS 168 applications)/GF-131 and TAG-0050

(ACS applications).