3.1 INTRODUCTION

The information in this Chapter provides a guide to the operation of the Benchmark 1.5 Boiler

using the Control Panel mounted on the front of the unit. It is imperative that the initial startup of

this unit be performed by factory trained personnel. Operation prior to initial startup by factory

trained personnel will void the equipment warranty. In addition, the following WARNINGS and

CAUTIONS must be observed at all times.

CAUTION

All of the installation procedures in Chapter 2 must be completed

before attempting to start the unit.

WARNING

ELECTRICAL VOLTAGES IN THIS SYSTEM MAY INCLUDE 460,

208 AND 24 VOLTS AC. IT MUST BE SERVICED ONLY BY

FACTORY CERTIFIED SERVICE TECHNICIANS

WARNING

DO NOT ATTEMPT TO DRY FIRE THE BOILER. STARTING

THE UNIT WITHOUT A FULL WATER LEVEL CAN SERIOUSLY

DAMAGE THE UNIT AND MAY RESULT IN INJURY TO

PERSONNEL OR PROPERTY DAMAGE. THIS SITUATION WILL

VOID ANY WARRANTY.

3.2 CONTROL PANEL DESCRIPTION

The Benchmark 1.5 Control Panel shown in Figure 3-1 contains all of the controls, indicators

and displays necessary to operate, adjust and troubleshoot the Benchmark 1.5 Boiler. These

operating controls, indicators and displays are listed and described in Table 3-1. Additional

information on these items are provided in the individual operating procedures provided in this

Chapter.