beautypg.com

Rockwell Automation 6185-V Industrial 18.1 Inch Flat Panel Monitor User Manual User Manual

Page 8

background image

8

Industrial 18.1" Flat Panel Monitor

Publication 6185-UM001B-EN-P

This section describes how to install the RAC6185 18.1" Flat Panel
Monitor.

When installing the unit, it is important to consider environmental
factors at the site that could affect performance as well as possible
effects from equipment operation on personnel and nearby equipment.

Following the guidelines will help ensure that the monitor will provide
safe and reliable service.

• Ensure that sufficient power is available from a single phase AC

outlet at the site.

• Ensure that sufficient space is available around air inlets and outlets

to provide the circulation necessary for cooling. Never allow air
passages to become obstructed.

• Ensure that the ambient air temperature will not exceed the

specified maximum temperature. A user supplied fan, heat exchanger
or air conditioner may be required to meet this condition in some
installations.

• Leave the monitor’s enclosure or cover in place at all times during

operation. The cover affords protection against high voltages inside
the monitor and inhibits radio-frequency emissions that might
interfere with other equipment.

• The Federal Communications Commission has prepared a pamphlet

that addresses the problem of radio frequency interference to radio
and television reception, which should be consulted in case of
problems with such interference. This publication, “How to Identify
and Resolve Radio/TV Interference Problems” (Stock #004-000-
00345-4) may be obtained from the US Government Printing Office,
Washington, DC 20402.

• Determine the minimum and maximum ambient humidity for the

monitor by consulting the specification sheets at the back of this
manual. Ensure that the humidity of the ambient air will not exceed
these limits. In very dry environments, static charges build up very
readily. Proper grounding of the equipment through the AC power
cord can help reduce the likelihood of static discharges, which may
cause shocks and damage electronic components.

• Following product hose down, a monitor with a capacitive

touchscreen may not operate properly until the surface area between
the front panel sealing gasket and the touchscreen sensor dries
completely. Drying time can vary from 30 minutes to two hours,
depending on ambient conditions. Furthermore, the monitor should
not be powered up and operational during a hose down.

Installing the RAC6185

18.1" Flat Panel Monitor

(All Models)