Commissioning

Before switching on

7

l

38

LDEDS−CCU210B EN 4.0

7

Commissioning

7.1

Before switching on

Before initial switch−on, check ...

ƒ

... whether the drive is undamaged.

ƒ

... the entire wiring with regard to completeness, short circuit and earth fault.

ƒ

... whether the mains and the motor are connected in correct phase relation.

ƒ

... whether the control bars and message bars are connected in correct phase
relation.

ƒ

... whether the configuration saved is valid for the application.

ƒ

... whether the parameters loaded are optimally adapted to the motor.