Commissioning

Test commissioning

Test commissioning with keypad control

7

88

EDS84ABD302 EN 4.0

7.5.1

Test commissioning with keypad control

Step-by-step commissioning
1. Wiring of power terminals
Make use of the ”Electrical installation” chapter or the Mounting Instructions to wire the

power terminals according to the requirements of your device.
2. Wiring of control terminals.

Digital inputs at terminal X4

Assignment

Information

DI1

DI2

DI3

RFR

X4

24E

DO1

12I

AR A1U GND

DI4

RFR

z

Controller enable

RFR = High

z

Error reset

High → Low (edge-controlled)

3. If you can be sure that the frequency inverter is in the default state (Lenze setting),

you can skip this commissioning step. If not, establish the Lenze setting of the

frequency inverter as follows:

-0-

_

`

Š

PASS

2 sec.

0000

_ `

....

Š

`

....

Š

....

Œ

Ž







‘

`

_

_

_ `

....

C002

c001

01

-1-

8888

_ `

....

84BLMEN001

z

Select menu -1- (all parameters)

z

Press ”Enter” key

z

Set C002 code

z

Press ”Enter” key

z

Set c001 subcode

z

Press ”Enter” key

z

Set value ”01”

z

Press ”Enter” key