24
SECTION 5: POWERING UP
WARNING:
ENSURE SAFE WIRING PRACTICES ARE FOLLOWED
The instrument must be powered from a supply according to the wiring label on the side of the unit.
The supply will be either 100 to 240V AC, or 24/48V AC/DC powered. Check carefully the supply
voltage and connections before applying power.
CAUTION:
When powering up for the first time, disconnect the output connections.
5.1 Powering Up Procedure
At power up, a self-test procedure is automatically started, during which all
LED
segments and
indicators are lit. At the first power up from new, or if the option modules are changed,
Goto ConF
will be displayed, indicating configuration is required (refer to
section 6
). At all other
times, the instrument returns to operator mode once the self-test procedure is complete.
5.2 Overview of Front Panel
The illustration below shows a typical instrument front panel. Refer to the following table
– Typical
LED functions
for a description of the front panel indicators.
Figure 33. Front panel and keys