beautypg.com

F. mounting optional carry handle, F.1 mounting stacking points on top cover, Mounting stacking points on top cover – Barco CLM HD8 R9050130 User Manual

Page 215

background image

F. Mounting optional Carry handle

F. MOUNTING OPTIONAL CARRY HANDLE

About this chapter

This chapter describes the procedures to mount the optional carry handle to CLM projector. When this optional carry handle is
mounted, the projector can be suspended with the rigging clamps and stacking of projector is possible.

Overview

Mounting stacking points on top cover

Preparing the new carry handle

Preparing the projector

Mounting the carry handle

C

AUTION

:

While mounting the carrying handle, save the removed bolts.

When removing a mounted carrying handle again and mounting the original feet back, always use the original
bolts (M10x16) !

Never use the bolts which are used to mount the carrying handle. These bolts will damage the heat exchanger
with a cooling liquid leakage as result.

Image F-1

F.1

Mounting stacking points on top cover

Why mounting the stacking points ?

The stacking points must be mounted for the following reasons:

To turn the projector upside down and place it on the top cover.

To stack two projectors on each other.

How to mount the stacking points

1. Break out the circular holes in the top cover.

R59770057 CLM HD8 15/03/2010

211

This manual is related to the following products: