Audience, What’s new in this document, Related publications – Brocade FastIron Ethernet Switch Software Upgrade Guide User Manual
Page 10
Audience
This document is designed for network engineers with a working knowledge of Layer 2 and Layer 3
switching and routing.
If you are using a Brocade Layer 3 Switch, you should be familiar with the following protocols if
applicable to your network - IP, RIP, OSPF, BGP, ISIS, IGMP, PIM, DVMRP, and VRRP.
What’s new in this document
This document is updated for FastIron software release 08.0.10a.
Related publications
The following Brocade Communication Systems, Inc documents supplement the information in this
guide and can be located at
•
FastIron Ethernet Switch Administration Guide
•
FastIron Ethernet Switch Platform and Layer 2 Switching Configuration Guide
•
FastIron Ethernet Switch Layer 3 Routing Configuration Guide
•
FastIron Ethernet Switch IP Multicast Configuration Guide
•
FastIron Ethernet Switch Security Configuration Guide
•
FastIron Switch Stacking Configuration Guide
•
FastIron Ethernet Switch Traffic Management Guide
•
FastIron Ethernet Switch Software Licensing Guide
•
FastIron Feature Support Matrix
•
Brocade ICX 6430-C Switch Installation Guide
•
Brocade ICX 6430 and ICX 6450 Stackable Switches Hardware Installation Guide
•
Brocade FCX Series Hardware Installation Guide
•
Brocade FastIron ICX 6610 Stackable Switch Hardware Installation Guide
•
Brocade ICX 6650 Ethernet Switch Installation Guide
•
Brocade FastIron SX Series Chassis Hardware Installation Guide
•
Brocade ICX 7750 Switch Hardware Installation Guide
•
Brocade ICX 6450-C12-PD Switch Installation Guide
•
Brocade FastIron SX, FCX, and ICX Diagnostic Reference
•
Unified IP MIB Reference
Audience
8
FastIron Ethernet Switch Software Upgrade Guide
53-1003089-02