beautypg.com

Vanguard ATRT-03_03B S2 User Manual

Page 104

background image

ATRT-03 S2, ATRT-03A S2, AND ATRT-03B S2 USER’S MANUAL

REV 2

99

3.6.4. Viewing a Test Plan Directory on the LCD Screen (ATRT-03B S2 Only)

Follow the steps below to view a directory of all the test plans stored in the ATRT-03B S2’s
internal Flash EEPROM:

a. Start from the “START-UP” menu:

Press the

[3]

key (TEST PLANS).

b. The following screen will be displayed:

Press the

[3]

key (PLAN DIRECTORY).

c. The following screen will be displayed:

Press the

[PAPER Contrast]

or

[PAPER Contrast]

key to scroll through the

test plan directory. The test plan header will be displayed as shown:

#1 YND1
NUM TESTS: 2


GE
EXAMPLE #3
5KVA

TEST PLAN DIRECTORY


"UP" TO SCROLL FWD
"DWN" TO SCROLL RVS

1.

LOAD TEST PLAN

2.

UNLOAD TEST PLAN

3.

PLAN DIRECTORY

4.

ERASE TEsT PLAN

5.

SAVE TEST PLAN


1.

RUN TEST

2.

SETUP

3.

TEST PLANS

4.

DIAGNOSTIC


TIME: 15:45:15

DATE: 07/20/10

This manual is related to the following products: