beautypg.com

Common operations on playlist elements – EVS IPDirector Version 6.2 - June 2013 PLAYLIST PANEL User Manual User Manual

Page 154

background image

When the operator insert a linked clip after a given playlist element, the system will
insert other linked clips of the group after the corresponding element in the other
playlists.

If there are more linked playlists than linked clips, nothing will happen on the
exceeding playlists. A warning message will be displayed in the Status Bar to indicate
that playlists are now desynchronized.

If there are more linked clips than linked playlists, nothing will happen to the exceeding
clips.

In case the clip inserted in one linked playlists is not linked to other clips, no operation
will be performed on the other linked playlists of the group and a warning message will
be displayed in the Status Bar to indicate that other playlists are now desynchronized.

7.5.3.

Common Operations on Playlist Elements

When the following operations are performed on linked clips from linked playlists, the
operation will be performed on the corresponding elements from all the linked playlists of

140

7. Ganged Playlists Management

EVS Broadcast Equipment S.A. - June 2013

Issue 6.2.A