beautypg.com

C.2.3 step 3 - configuring and uploading files, Step 3 - configuring and uploading files, 6whs &rqiljxulqj dqg 8sordglqj )lohv – Siemens CP 1515 User Manual

Page 250

background image

'RLQJ D )RUFHG 5HORDG

250

Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager

C79000-G8976-C171-01

5. After approximately 5 seconds, use the small pointed object again to

press the

5HORDG

button for approximately 30 seconds.

You will see the LEDs changing color in the range Amber, Red and Green
again.

6. When all LEDs turn Amber, release the

5HORDG

button.

The Power LED turns to Amber. Other LEDs will be off, or may flicker
Green to indicate LAN activity on the associated interface.

7.

Start the RLM Manager program and proceed with

“Step 3 - Configuring

and Uploading Files”

& 6WHS &RQILJXULQJ DQG 8SORDGLQJ )LOHV

The complete configuration and upload procedure of the forced reload
procedure is pictured in

Figure 45

.