beautypg.com

What is a project, Managing projects, Loading a project – Arturia KeyStep Pro Keyboard with Advanced Sequencer and Arpeggiator User Manual

Page 121: Chapter 6 [p.115

background image

6. WHAT IS A PROJECT?

A Project enables you to store and recall 16 Patterns per sequencer, as well as the state of

each sequencer. When you do a save, everything in the Project is saved: Seq/Drum mode

for Track 1, Seq/Arp mode for Tracks 2, 3 and 4; solo or mute state of each track; Scenes,

Chains, output mappings and current time divisions.

The edit options are flexible: in addition to Project Save, you can copy one Project to another

or erase a Project. For each of these operations, a screen message asks you to confirm

the action. The instructions below show the confirmation screens. The necessary buttons for

managing Projects are found in the Control section of the front panel.

6.1. Managing Projects

After using your KeyStep Pro for a while, you'll probably have a large number of sequences.

You may be working on a musical arrangement or performance and want to create

and safeguard a selection of your sequences for that purpose. KeyStep Pro Projects are

designed for that kind of situation.

The internal memory of the KeyStep Pro holds a total of 16 Projects. You could think of a

Project as a single song (although it could be an entire performance). Each Project contains:

• 16 Patterns for each of the four sequencers (Seq1, Seq2, Seq3, Seg4 and Drum),

including all the swing, randomness and probability settings for each Pattern

• A Control Mode preset (that is, a controller map), with independent settings for

each assignable control

• 16 Scenes
• Project-level settings for tempo, swing, randomness and probability.

Please refer to

Chapter 7 [p.132]

for information about other parameters that affect the way

Projects respond when you switch from one project to the next.

! Before switching to another Project, it's important to save the sequencer Patterns you've just been

working on. If you forget to save them, they will be lost forever. To save all the Patterns in a track, hold
down 'Save' and press the relevant track button (Track 1 to Track 4). To save all the Patterns in the current
Project, hold down 'Save' and press Project.

6.1.1. Loading a Project

To create a new Project, hold down the Project button and choose an empty Project by

selecting one of the 16 step buttons.

To load an existing Project, hold down the Project button and press the step button that

corresponds to the number of the Project you want to load. You can as well load a project

through midi: Send a Bank message on the Global MIDI Channel (controller mode channel)

changes the Project.

!: Be sure you have saved your current Project to another number before loading an existing Project!

Arturia - User Manual Keystep Pro - What is a Project?

115