Solare Datensysteme Solar-Log User Manual
Page 209

209
Schüco
IPE SN series
Procedure
1.
Open the inverter as shown in the inverter‘s instructions.
2. Connect terminals RS485+ and RS485- on all inverters to the two data cable wires in accordance with
the inverter instructions.
3. Terminate in the last inverter in accordance with the inverter instructions.
4. Close inverters.
Allocate communication address
•
Recommendation: Continuous numbering starting with 1.
•
Setting: Using the inverter operating display
•
Procedure: Start according to the inverter‘s instructions