72�2 ipe ct series – Solare Datensysteme Solar-Log User Manual
Page 206
206
Schüco
IPE CT series
72�2 IPE CT series
Easy Installation
Termination
Addressing
Interface
No
DIP switch
Yes
RS485
Selectable under Bonfiglioli
Overview
•
Integrated interface.
•
Where to connect: Terminal strip inside the inverter.
•
3-pin wiring.
•
Communication address must be allocated.
•
Installation steps
•
Switch off the inverters and Solar-Log™.
•
Connect inverters to the Solar-Log™.
•
Connect the inverters to each other.
•
Allocate communication address.
Connect inverters to the Solar-Log™
The wiring is done using a
•
self-made, shielded 3 wire data cable with a terminal block connector.
Procedure
1.
Get access to the inverter interface
2. If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector
Terminal strip inside the inverter
Terminal
RS485 terminal
► 1
► 1 A (Data+)
► 3
► 6 GND
► 4
► 3 B (Data-)
3. If only one inverter is to be connected this must be terminated.
In the inverter, set the DIP switch S1 for the terminal resistor to ON.
4. Insert the terminal block connector into the Solar-Log™ RS485 socket.
Connect the inverters to each other
•
Where to connect: Terminal strip on the inverter
•
3-pin wiring