33 gesolar, 33�1 gesolar – Solare Datensysteme Solar-Log User Manual
Page 110
110
GESOLAR
GESOLAR
33 GESOLAR
33�1 GESOLAR
Easy Installation
Termination
Addressing
Interface
No
Yes
No
RS485
Overview
•
Integrated interface
•
Where to connect: RJ45 plug outside the housing floor
•
2-pin wiring
•
Communication address does not have to be assigned
•
Installation steps
•
Switch off the inverters and Solar-Log™
•
Connect inverters to the Solar-Log™
•
Connect the inverters to each other
Connect inverters to the Solar-Log™
The wiring is done using a
•
ready-made BRJ2 data cable (optional extra; not supplied)
or
•
self-made cable connection with RS485 data cable and terminal block connector.
Caution
Risk of damage to the unit!
The Solar-Log™ also has an RJ45 socket, which must never be connected to the RJ45
socket on the inverter.
►
Only connect inverters via the RS485/422 Solar-Log™ interface(s).
Procedure
1.
If you are making the cable yourself, connect the wires as shown in the following diagram:
Solar-Log™ terminal strip connector
RJ45 inverter
Terminal
PIN
► 1
► 7
► 4
► 8
2. Insert the RJ45 plug into the RJ45 socket on the inverter.
3. If only one inverter is to be connected terminate this in accordance with the inverter instructions.
4. Insert the terminal block connector into the Solar-Log™ RS485 socket.