HEIDENHAIN TNC 360 ISO Programming User Manual
Page 180
![background image](https://www.manualsdir.com/files/815326/content/doc180.png)
8-27
8
Cycles
TNC 360
Fig. 8.33:
ROUGH-OUT cycle
Fig. 8.34:
CONTOUR MILLING cycle
Fig. 8.32:
PILOT DRILLING cycle
8.3
SL Cycles
The following scheme illustrates the application of the cycles Pilot Drilling,
Rough-Out and Contour Milling in part programming:
1. List of contour subprograms
G37
Cycle call not required.
2. Drilling
Define and call drilling tool
G56
Pre-positioning
Cycle call required!
3. Rough-out
Define and call tool for rough milling
G57
Pre-positioning
Cycle call required!
4. Finishing
Define and call finish milling tool
G58/G59
Pre-positioning
Cycle call required!
5. Contour subprograms
M02 *
Subprograms for the subcontours.
This manual is related to the following products: