Installation, Summary of installation procedure, Section 3 — installation – Grass Valley Trinix v.2.4.1 User Manual
Page 91: Section 3-installation

Planning and Installation Manual
91
Section
3
Installation
Summary of Installation Procedure
The following is a summary of the steps needed for installation of the
Trinix Routing Switcher System. Additional details may be found else-
where in this manual as indicated.
1.
Before unpacking the equipment, inspect the shipping carton for
evidence of freight damage. After unpacking carefully inspect all
equipment for freight damage.
If the contents have been damaged, notify the carrier and Grass
Valley (see
for contact information). Retain all shipping
cartons and padding material for inspection by the carrier.
Do not return damaged merchandise to Grass Valley until an appro-
priate claim has been filed with the carrier and a material return
authorization number has been received from Grass Valley.
2.
If the switcher is received without a rack, it should be mounted in a
19-inch wide frame or other suitable enclosure that provides power
and cooling facilities for the equipment.
a.
It may be necessary to install special rack spacers so that the
router's access door can be opened far enough to permit
removal of components on the right side of the chassis (such as
power supply modules). The spacers, which are available on
request, should only be installed when the rack's mounting
holes are recessed more than 0.6 inch (15.2 mm) from the front
surface of the rack. For more information, see
.
b.
Some switchers are supplied with PE-33016 Port Expanders,
which depending on the configuration can be used to provide
dual outputs, quad outputs, input expansion, output
expansion, and multi-chassis output monitoring. For
illustrations of port expander applications, see
c.
Power requirements are shown on
d.
Environmental limits are shown on