beautypg.com

7 completing the installation, Completing the installation, Hardware preparation and installation – Artesyn MVME8100/MVME8110 Installation and Use (September 2014) User Manual

Page 50

background image

Hardware Preparation and Installation

MVME8100 / MVME8110 Installation and Use (6806800P25G)

50

2.7

Completing the Installation

The MVME8100 / MVME8110 is designed to operate as an application-specific compute blade
or an intelligent I/O board/carrier. It can be used in any slot in a VME chassis. When the
MVME8100 / MVME8110 is installed in a chassis, you are ready to connect peripherals and
apply power to the board.

Figure 3-1 on page 52

show the locations of the various connectors on the MVME8100 /

MVME8110.

The console settings for the MVME8100 / MVME8110 are:

Eight bits per character

One stop bit per character

Parity disabled (no parity)

Baud rate of 9600 baud

Verify that hardware is installed and the power/peripheral cables connected are appropriate
for your system configuration.

Replace the chassis or system cover, reconnect the chassis to the AC or DC power source, and
turn the equipment power on.

Product Damage
RJ-45 connectors on modules are either twisted-pair Ethernet (TPE) or E1/T1/J1 network
interfaces. Connecting an E1/T1/J1 line to an Ethernet connector may damage your system.

Make sure that TPE connectors near your working area are clearly marked as network
connectors.

Verify that the length of an electric cable connected to a TPE bushing does not exceed
100 meters.

Make sure the TPE bushing of the system is connected only to safety extra low voltage
circuits (SELV circuits).

If in doubt, ask your system administrator.

This manual is related to the following products: