beautypg.com

Benchmark 1.5ln low nox boiler, Gf-120 – AERCO BMK 1.5 LN July 2011 User Manual

Page 5

background image

PR2: 05/09/12 Page

5 of 152

Benchmark 1.5LN Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0D

GF-120

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

Setting the Setpoint .................................................................................................. 54

5.3.1

5.4 REMOTE SETPOINT MODES ............................................................................ 55

Remote Setpoint Field Wiring ................................................................................. 55

5.4.1

Remote Setpoint Startup .......................................................................................... 56

5.4.2

5.5 DIRECT DRIVE MODES ..................................................................................... 56

Direct Drive Field Wiring ........................................................................................ 56

5.5.1

Direct Drive Startup ................................................................................................. 57

5.5.2

5.6 BOILER MANAGEMENT SYSTEM (BMS) .......................................................... 57

BMS External Field Wiring ..................................................................................... 57

5.6.1

BMS Setup and Startup ............................................................................................ 58

5.6.2

5.7 COMBINATION CONTROL SYSTEM (CCS) ...................................................... 58

Combination Control System Field Wiring ............................................................. 58

5.7.1

Combination Control System Setup and Startup ..................................................... 59

5.7.2

CHAPTER 6

SAFETY DEVICE TESTING ....................................................................... 61

6.1 TESTING OF SAFETY DEVICES ....................................................................... 61

6.2 LOW GAS PRESSURE FAULT TEST ................................................................. 61

6.3 HIGH GAS PRESSURE TEST ............................................................................ 62

6.4 LOW WATER LEVEL FAULT TEST .................................................................... 63

6.5 WATER TEMPERATURE FAULT TEST ............................................................. 63

6.6 INTERLOCK TESTS ............................................................................................ 65

REMOTE INTERLOCK ......................................................................................... 65

6.6.1

DELAYED INTERLOCK ....................................................................................... 65

6.6.2

6.7 FLAME FAULT TESTs ........................................................................................ 65

6.8 AIR FLOW FAULT TESTS .................................................................................. 67

6.9 SSOV PROOF OF CLOSURE SWITCH .............................................................. 67

6.10 PURGE SWITCH OPEN DURING PURGE ....................................................... 68

6.11 IGNITION SWITCH OPEN DURING IGNITION ................................................ 69

6.12 SAFETY PRESSURE RELIEF VALVE TEST .................................................... 70

CHAPTER 7

MAINTENANCE ............................................................................................ 71

7.1 MAINTENANCE SCHEDULE .............................................................................. 71

7.2 IGNITER-INJECTOR ........................................................................................... 72

7.3 FLAME DETECTOR ............................................................................................ 74

7.4 COMBUSTION CALIBRATION & RSI REGULATOR ADJUSTMENT ................. 74

RSI Regulator Pressure ............................................................................................ 74

7.4.1

7.5 SAFETY DEVICE TESTING ................................................................................ 77

7.6 BURNER ASSEMBLY INSPECTION .................................................................. 77

7.7 CONDENSATE DRAIN TRAP ............................................................................. 80

7.8 SHUTTING THE BOILER DOWN FOR AN EXTENDED PERIOD OF TIME ....... 81

7.9 PLACING THE BOILER BACK IN SERVICE AFTER A PROLONGED SHUTDOWN . 81