2.4 SITE PREPARATION.

Ensure that the site selected for installation of the Benchmark 1.5 Boiler includes:

Access to AC Input Power at 120 VAC, 1-Phase, 60 Hz @ 20

Access to Natural Gas line at a minimum pressure of 4 inches W.C.

Installation Clearances

2.4.1

The unit must be installed with the prescribed clearances for service as shown in Figure 2-1.

The minimum clearance dimensions, required by AERCO, are listed below. However, if Local

Building Codes require additional clearances, these codes shall supersede AERCO’s

requirements. Minimum acceptable clearances required are:

Sides: 24 inches

Front : 24 inches

Rear:

30 inches

Top:

18 inches

All gas piping, water piping and electrical conduit or cable must be arranged so that they do not

interfere with the removal of any panels, or inhibit service or maintenance of the unit.

Figure 2-1: Benchmark 1.5 Boiler Clearances

WARNING

KEEP THE UNIT AREA CLEAR AND FREE FROM ALL

COMBUSTIBLE MATERIALS AND FLAMMABLE VAPORS OR

LIQUIDS.

CAUTION

While packaged in the shipping container, the boiler must be

moved by pallet jack or forklift from the FRONT ONLY.

FOR MASSACHUSSETTS ONLY:

For Massachusetts installations, the boiler must be installed by a

plumber or gas fitter who is licensed within the Commonwealth of

Massachusetts. In addition, the installation must comply with all

requirements specified in Chapter 1 (Safety Precautions), pages

1-2 & 1-3.