Aerco/protonode gateway, Gf-129 – AERCO ProtoNode Gateway Rev 1 (with internal LEDs) User Manual
Page 9

Page 9 of 64
USER MANUAL
AERCO/ProtoNode Gateway
OMM-0080_0D
AERCO International, Inc.
• 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288
VD2:011712
1
GF-129
2.3.3.1 ProtoNode RER: S0 – S3 (and A1*) DIP Switch Configuration Settings
S0
S1
S2
S3 A1*
Profile
Off
Off Off Off
Off
BACnet/IP/BACnet MS/TP, 1 ACS/BMS II/BMS, 4 C-More Controlled Boilers
On
Off Off Off
Off
BACnet/IP/BACnet MS/TP, 1 ACS/BMS II/BMS, 8 C-More Controlled Boilers
Off
On Off Off
Off
BACnet/IP/BACnet MS/TP, 1 ACS/BMS II/BMS, 12 C-More
Controlled Boilers
On
On Off Off
Off
BACnet/IP/BACnet MS/TP, 1 ACS/BMS II, 4 Modulex Boilers With BCMs
Off
Off On Off
Off
BACnet/IP/BACnet MS/TP, 4 ECS/SP Systems
On
Off On Off
Off
BACnet/IP/BACnet MS/TP, 12 C-More, 6 ECS/SP,
4 Modulex and 2 ACS/BMS II
Off
On On Off
Off
Metasys N2, 1 ACS/BMS II/BMS, 4 C-More Controlled Boilers
On
On On Off
Off
Metasys N2, 1 ACS/BMS II/BMS, 8 C-More Controlled Boilers
Off
Off Off On
Off
Metasys N2, 1 ACS/BMS II/BMS CS, 12 C-More Controlled Boilers
On
Off Off On
Off
Metasys N2, 1 ACS/BMS II, 4 Modulex Boilers with BCMs
Off
On Off On
Off
Metasys N2, 4 ECS/SP Systems
On
On Off On
Off
Metasys N2, 12 C-More, 6 ECS/SP, 4 Modulex and 2 ACS/BMS II
Off
Off On On
Off
Modbus TCP, 1 ACS/BMS II/BMS, 4 C-More Controlled Boilers
On
Off On On
Off
Modbus TCP, 1 ACS/BMS II/BMS, 8 C-More Controlled Boilers
Off
On On On
Off
Modbus TCP, 1 ACS/BMS II/BMS, 12 C-More Controlled Boilers
On
On On On
Off
Modbus TCP, 1 ACS/BMS II, 4 Modulex Boilers With BCMs
Off
Off Off Off
On
Modbus TCP, 4 ECS/SP Systems
On
Off Off Off
On
Modbus TCP, 12 C-More, 6 ECS/SP, 4 Modulex and 2 ACS/BMS II
*NOTE:
The first sixteen profiles in the chart above (Section 2.3.3.1) require that DIP
switches A1 through A8 be set to OFF, which is the default setting, so those
switches do not need to be accessed for those configurations (and so are not
shown in the above chart). However, the last two profiles do require that DIP
switch A1 be set to ON, so for those two profiles, DIP Switch A1 needs to be
changed to ON (A2 through A8 remain in the OFF position).
A photograph showing the DIP switch locations inside the unit is on the next page.