background image

Page 3 of 64

USER MANUAL

AERCO/ProtoNode Gateway

OMM-0080_0D

AERCO International, Inc.

• 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

VD2:011712
1

GF-129

TABLE OF CONTENTS

1. Introduction ............................................................................................................................ 5
2. Bacnet/LONWorks Setup through Protocessor Protonode RER/LER ............................... 7

2.1 Installation Steps For The Customer ........................................................ 7
2.2 Record Identification Data ...................................................................... 7
2.3 Configure the DIP Switches ..................................................................... 7

2.3.1 Setting the Node/ID Device Instance (DIP Switch A0 – A7) for BACnet MS/TP,
BACnet/IP, and Metasys N2 ................................................................................................ 7
2.3.2 Setting the Serial Baud Rate (DIP Switch B0 – B3)

for BACnet MS/TP & Metasys N2 .... ..7

2.3.3 Using S0 – S3 bank of DIP Switches to select and load Configuration Files ............ 8

3. Interfacing the ProtoNode to The AERCO Control System (ACS, BMS II, or BMS) ....... 11

3.1 ProtoNode RER and LER showing connection ports ................................ 11
3.2 ACS/BMS II/BMS Wiring Connections to ProtoNode RER and LER ........... 11
3.3 Modulex BCM ...................................................................................... 13
3.4 ECS .................................................................................................... 13
3.5 C-MORE .............................................................................................. 14

4. Connection from ProtoNode RER to BACnet MS/TP and Metasys N2 networks ......... 15

4.1 Wiring the ProtoNode RER to RS-485 Field Protocol ............................ 15
4.2 Wiring the ProtoNode LER Field Port to a LonWorks network ............... 15
4.3 Power-Up the ProtoNode RER or LER ................................................ 15
4.4 Commisioning the ProtoNode LER on a Lonworks network ................... 16
4.5 Sending Write Values ........................................................................ 16

5. Install and Run the Utility Software to Setup ip Address for bacnet/IP.......................... 17

5.1 Connect the PC to the ProtoNode via the Ethernet port ......................... 17
5.2 Connect to the ProtoNode using RUI (Ruinet) ........................................ 18
5.3 Set IP Address for BACnet/IP ............................................................... 18

Appendix A. Troubleshooting Tips ......................................................................................... 20

A.1 - LED Diagnostics for Modbus RTU Communications Between the Protonode
and AERCO’s Boiler Controllers ................................................................... 20

A.1.1 - ProtoNode LER - LED Locations and Functions .................................................... 20
A.1.2 - ProtoNode RER - LED Locations and Functions .................................................. 22

A.2 - Troubleshooting Procedures for Connection Problems .......................... 23

Appendix B. Reference ............................................................................................................. 25

B.1 Specifications ...................................................................................... 25

B.1.1 Compliance with UL Regulations ............................................................................. 25

B.2 Address DIP Switch Settings ................................................................ 26

Appendix C. Configuration Information ................................................................................. 33

C.1 Default Modbus RTU COM Settings for AERCO Controllers ..................... 33
C.2 BACnet/IP, BACnet MS/TP, Metasys N2, and LonWorks Points List ......... 34

C.2.1 - Four C-Mores and One ACS/BMS II/BMS ............................................................. 34
C.2.2 - Eight C-Mores and One ACS/BMS II/BMS ............................................................ 36
C.2.3 - Twelve C-Mores and One ACS/BMS II/BMS ......................................................... 40
C.2.4 - MLX and One ACS/BMS II/BMS ............................................................................ 45
C.2.5 – ECS…………………………………………………………………………………...….47
C.2.6 - Twelve C-Mores, Six ECS/SP, Four Modulex and Two ACS/BMS II/BMS ............ 48

Appendix D. Limited 2 year Warranty ..................................................................................... 63