beautypg.com

5 sending write values, Aerco/protonode gateway, Gf-129 – AERCO ProtoNode Gateway Rev 1 (with internal LEDs) User Manual

Page 16

background image

Page 16 of 64

USER MANUAL

AERCO/ProtoNode Gateway

OMM-0080_0D

AERCO International, Inc.

• 100 Oritani Dr. • Blauvelt, New York 10913 • Phone: 800-526-0288

VD2:011712
1

GF-129

Pinouts

ProtoNode Pin # Pin assignment

Pin 1

RS-485 +

Pin 2

RS-485 -

Pin 3

RS-485 GND

Pin 4

V +

Pin 5

V -

Pin 6

FRAME GND

4.4 Commissioning the ProtoNode LER on a Lonworks network

Commissioning may only be performed by the LonWorks administrator.

To commission the ProtoNode LER LonWorks port, insert a small screwdriver in the commissioning hole
on the face of the LER’s enclosure to access the Service Pin. See the illustration on the ProtoNode LER as
to which way to toggle the screw driver during commissioning.

4.5 Sending Write Values

The administrator must setup their host management system to write through the gateway to the C-
More, ACS or BMS II three or four times within the timeout value.

AERCO Device

Parameter

Default Value

Range

Menu

BMS II

Network Timeout

30 s

5 to 240 s

RS-232

C-More

Network Timeout

30 s

5 to 999 s

Configuration

ACS

Network Timeout

30 s

5 to 240 s

RS-232

Refer to GF-112, GF-124, and GF-131 for more information.

LonWorks Service Pin