beautypg.com

Initial commissioning, 1 align transmitter and receiver, 1 prepare for alignment – Pilz PSENvip RL D P User Manual

Page 83: 2 adjustment templates, 7commissioning, 2 initial commissioning

background image

7.2

Initial commissioning

7

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-2

7.2

Initial commissioning

7200

Initial commissioning

7-

7.2.1

Align transmitter and receiver

Align transmitter and receiver

7-

Inbetriebnahme_Erstinbetriebnahme_Ausrichten

Please note the following when aligning the transmitter and receiver:

Once installed, the transmitter and receiver must be exactly aligned
to each other and to the tip of the upper tool. The vertical and hori-
zontal alignment is performed using adjustment templates and is dis-
played on the receiver.

The transmitter and receiver must also be aligned after changing ei-
ther the PSENvip transmitter or receiver.

7.2.1.1

Prepare for alignment

Prepare for alignment

7-

Inbetriebnahme_Erstinbetriebnahme_Ausrichtung_vorbereiten

Please note the following when preparing for alignment:

Transmitter and receiver must be installed correctly on the press
brake (see Chapter 5, "Installation") and electrically wired (see Chap-
ter 6, "Wiring").

An upper tool must be fitted to the right and left-hand edge of the
press brake.

Switch on the supply to the PSENvip.

7.2.1.2

Adjustment templates

Adjustment templates

7-

Inbetriebnahme_Erstinbetriebnahme_Justageschablonen

Two adjustment templates and the information on the display provide
support when aligning the transmitter and receiver.

Please note the different cut-outs around the cross-hair on the two ad-
justment templates. On the left-hand adjustment template in the illustra-
tion below, the cross-hair is located within a square cutout. The different
forms make it easier to secure information about the direction of move-
ment when aligning the transmitter and receiver.