7.5

Check protective equipment

7

Commissioning

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

7-24

The test rod must be detected along the whole length of the detection
zone.

The OSSDs switch to the OFF state. The LED on the receiver lights up
red.

Function test with 10 mm and 15 mm test piece

Position the 10 mm high section of the test piece on top of the lower
tool.

Initiate a press stroke.

Fig. 7-22:

Function test using test piece

The test piece breaks the protected field. The press stroke is stopped.
The upper tool should not touch the test piece.

Once the press stroke has stopped, push the 15 mm high section of
the test piece beneath the upper tool.

The upper tool should not touch the test piece.

Function test using the 35 mm test piece

Start up the press.

Position the 35 mm high section of the test piece on top of the lower
tool.

Initiate a press stroke.

INFORMATION
The following tests must be run on the left- and right-hand end
as well as in the centre of the press brake:
- During initial commissioning: 10 times
- During the daily check and during a tool change: 3 times