beautypg.com

Putting into operation with post column reactor – Metrohm 844 UV/VIS Compact IC User Manual

Page 64

background image

Table of contents

starts up. If column heating has been selected on the tab

Configuration

(see Section 3.3.1) then the column heating will

also start up. The chromatogram window of the set data

recorder opens and the baseline(s) are shown continuously.

4 Check for leaks

• Check all the capillaries and their connections from the high-

pressure pump to the detector block for escaping liquid. If

eluent is escaping then the corresponding compression

fitting should be tightened or a new connection should be

made.

5 Condition system

• Rinse the system with eluent until the desired stability of the

baseline is reached (normally 30…60 min; if the eluent is

changed, the establishment of the ion exchanger equilibrium

on the separating column can take longer).

• The instrument is now ready for sample determinations using

the selected system.

2.10.2 Putting into operation with post column reactor

The two Versions IC 2.844.0020 and 2.844.0120 are supplied with post
column reactor

101. Before sample injection can be done, the whole

system must be checked for leaks and conditioned with eluent until a
stable baseline has been achieved. Proceed as follows:

When inserting the column always make sure that it is inserted

correctly in the flow direction shown on the sticker (the arrow must

point in the flow direction).

1 Open and connect system

• Start the «IC Net» PC program, if it has not already been

started.

• Select

File / Open / System

in the main window. Open the

system file created in Section 2.5.4 for the 844 UV/VIS

Compact IC.