3 - install your controller, Controller mounting dimensions, Chapter 3 – Rockwell Automation 2080-LC20-20QBBR Micro820 20-point Programmable Controllers User Manual User Manual
Page 27: Install your controller, Chapter

Rockwell Automation Publication 2080-UM005A-EN-E - December 2013
19
Chapter
3
Install Your Controller
This chapter serves to guide the user on installing the controller. It includes the
following topics.
Controller Mounting
Dimensions
Mounting dimensions do not include mounting feet or DIN rail latches.
Topic
Page
Controller Mounting Dimensions
Connect the Controller to an EtherNet/IP Network
Install the 2080-REMLCD Module
46205
Measurements in millimeters (inches)
104 (4.09)
75 (2.95)
90 (3.54)
This manual is related to the following products:
- 2080-LC20-20AWBR Micro820 20-point Programmable Controllers User Manual 2080-LC20-20QWBR Micro820 20-point Programmable Controllers User Manual 2080-LC20-20AWB Micro820 20-point Programmable Controllers User Manual 2080-LC20-20QBB Micro820 20-point Programmable Controllers User Manual 2080-LC20-20QWB Micro820 20-point Programmable Controllers User Manual