beautypg.com

RKI Instruments SDM-2012 PC Controlled Configuration User Manual

Page 92

background image

87 • Bump Testing a Gas Tracer

17. After calibration gas has been applied to the ppm sensor, fresh air will be

applied to the standard 3 sensors (catalytic LEL, O

2

, and CO) and the

%volume sensor (if installed) for 45 seconds and the PC Controller program
will perform a zero adjustment.

Figure 67: Air Flowing to Standard 3 Sensors

The PC Controller Program will analyze the zero adjustment results. If any of
the standard 3 sensors or %volume sensor (if installed) failed the zero
adjustment, the bump test will be aborted.