beautypg.com

RKI Instruments SDM-2012 PC Controlled Configuration User Manual

Page 196

background image

191 • Bump Testing GX-2012s and Gas Tracers

19. If you are not bump testing an instrument or instruments with a %volume

sensor installed, continue to step 22.

If you are bump testing an instrument or instruments with a %volume sensor
installed, you will be prompted to change the GAS 2 cylinder. The pump(s) on
the instrument(s) will stop.

20. Change the cylinder connected to the GAS 2 fitting to the %volume calibration

cylinder.

21. When you have changed the GAS 2 cylinder, click OK. The bump test will

continue and the second GAS 2 calibration gas will be applied to the %volume
sensor for the duration specified in the Gas Exposure Time parameter in the
Configuration Window.

Figure 151: %Volume GAS 2 Flowing

The PC Controller Program will analyze the results. If the bump test on the
%volume sensor fails for any instruments and Force Calibration is selected, a