beautypg.com

RKI Instruments SDM-2012 PC Controlled Configuration User Manual

Page 197

background image

Bump Testing GX-2012s and Gas Tracers • 192

calibration will automatically begin on the %volume sensors for those
instruments and GAS 2 calibration gas will continue to flow.

22. After GAS 2 calibration gas has been applied, the docking station will purge

with fresh air for 45 seconds.

Figure 152: Fresh Air Purge