beautypg.com

RKI Instruments SDM-2012 PC Controlled Configuration User Manual

Page 76

background image

71 • Calibrating a GX-2012

11. After air is applied, and if all the channels passed the zero adjustment,

calibration gas will be applied. The GAS 1 indicator on the program screen will
come on. Calibration gas will be applied to the instrument(s) for 90 seconds.

Figure 53: GAS 1 Calibration Gas Flowing

The PC Controller Program will analyze the results.