Festo Контроллер двигателя CMMD-AS User Manual
Page 59

3. Product description
Festo P.BE-CMMD-AS-HW-EN 1002NH
59
T
Transition condition
Actions of the user
T1
RESET / Power ON
–
T2
Time out has expired or the firmware download is
complete.
–
T3
The initialisation has been carried out successfully.
–
T4
DIN4=1 and DIN5=1
T5
"Torque control" was selected in the commissioning
software.
Setpoint specification via AIN0/AGND
T6
"Speed control" was selected in the commissioning
software.
Setpoint specification via AIN0/AGND
T8
"Positioning" was selected in the commissioning
software.
Set selection via
DIN0 … DIN3, DIN10, DIN11
Start for the positioning process:
DIN8=1
T9
All parameters for the jog mode were set in the
commissioning software
(e.g. max. speed, acceleration ...).
Selection I/O mode:
DIN9=0, DIN12=1
Jog +: DIN10=1
Jog –: DIN11=1
T10
–
Selection I/O mode:
DIN9=0, DIN12=1
T11
Selection of the homing method and parametrisation of
the speeds and accelerations in the commissioning
software.
Selection I/O mode: 0
DIN9=0, DIN12=0
Selection of positioning record 0
Start for positioning process:
DIN8=1
T12
Drive is referenced.
–
T13
–
DIN5=0
T15
–
DIN5=0
T16
–
DIN5=0
T17
–
DIN4=0
T18
–
Write or read request to SD card such
as:
Load parameters
- Save parameters
- Firmware download.
T19
The SD card was initialised successfully.
–
T20
"Load from SD after restart" was selected in the
commissioning software.
–
T21
Parameter record was loaded.
–
T22
A fault has occurred which causes the end stage to be
switched off
–
T23
–
–
T24
–
Edge controlled fault acknowledgement
DIN5: 1 – 0
T25
The error was acknowledged and no other errors are
pending.
–
Table 3.17 I/O sequence control