Allied Telesis SwitchBlade x3112 User Manual
Installation guide, Switchblade x3112
Table of contents
Document Outline
- Contents
- Figures
- Tables
- Preface
- Chapter 1
- Overview
- Introduction
- AT-SBx3112 Chassis
- AT-SBx31GT24 Line Card
- AT-SBx31GT40 Line Card
- AT-SBx31GP24 PoE Line Card
- AT-SBx31GS24 SFP Line Card
- AT-SBx31GC40 Line Card
- AT-SBx31XZ4 XFP Line Card
- AT-SBx31XS6 SFP+ Line Card
- 10/100/1000Base-T Twisted Pair Ports
- Power over Ethernet on the AT-SBx31GP24 Line Card
- Port Numbers on the AT-SBx31GC40 Line Card
- Port LEDs on the Ethernet Line Cards
- AT-SBx31CFC Central Fabric Controller Card
- Power Supplies
- AT-SBxFAN12 Module
- Power Supply Interfaces (Opto-couplers)
- Module Names in the Management Software
- Management Software Releases for the Hardware Components
- Chapter 2
- Safety Precautions and Site Preparation
- Chapter 3
- Installing the Chassis in an Equipment Rack
- Chapter 4
- Installing the Power Supplies
- Chapter 5
- Installing the AT-SBx31CFC Card and Ethernet Line Cards
- Chapter 6
- Installing the Transceivers and Cabling the Ports
- Guidelines to Cabling the AT-SBx31GP24, AT-SBx31GT24, and AT- SBx31GT40 Line Cards
- Guidelines to Installing SFP, SFP+, CSFP, and XFP Transceivers
- Installing SFP Transceivers in the AT-SBx31GS24 Line Card
- Installing SFP and CSFP Transceivers in the AT-SBx31GC40 Line Card
- Installing SFP+ Transceivers in the AT-SBx31XS6 Line Card
- Installing AT-SP10TW Cables in the AT-SBx31XS6 Line Card
- Installing XFP Transceivers in the AT-SBx31XZ4 Line Card
- Cabling the NET MGMT Port on the AT-SBx31CFC Card
- Chapter 7
- Powering On the Chassis
- Verifying the Installation
- Powering On the AT-SBxPWRSYS1 AC Power Supply
- Powering on the AT-SBxPWRPOE1 AC Power Supply
- Powering On the AT-SBxPWRSYS1 DC System Power Supply
- Choosing a Method for Attaching the Grounding Wire
- Connecting the Grounding Wire with the Grounding Terminal
- Connecting the Grounding Wire with Bare Wire
- Choosing a Method for Attaching the Power Wires
- Connecting the DC Power Wires with the Straight Terminals
- Connecting the DC Power Wires with the Right Angle Terminals
- Connecting Bare DC Power Wires
- Monitoring the Initialization Process
- Chapter 8
- Verifying the Hardware Operations of the Chassis
- Chapter 9
- Troubleshooting
- Appendix A
- Technical Specifications