beautypg.com

Allied Telesis SwitchBlade x3112 User Manual

Page 110

background image

Chapter 4: Installing the Power Supplies

110

Figure 65. Loosening the Handle locking Screw on the AT-SBxPWRPOE1

DC Power Supply

5. Raise the locking handle on the AT-SBxPWRPOE1 DC Power Supply,

as shown Figure 66.

Figure 66. Raising the Handle on the AT-SBxPWRPOE1 DC Power

Supply

6. Align and insert the AT-SBxPWRSYS1 Module into slot C or D. Figure

67 on page 111 shows the power supply installed in slot D.

Caution

The AT-SBxPWRSYS1 DC Power Supply will not work in slot A or
B.