beautypg.com

Figure 130: tightening the handle locking screw – Allied Telesis SwitchBlade x3112 User Manual

Page 173

background image

SwitchBlade x3112 Installation Guide

173

Figure 130. Tightening the Handle Locking Screw

8. Before attaching the power wires from the power supply to the circuit

breaker in the wiring closet, check that the circuit breaker is off.

9. Connect the power wires to the circuit breaker.

10. Turn the circuit breaker on.

11. Turn the On/Off switch on the power supply to the On position. See

Figure 131 on page 174.

Handle locking
screw