beautypg.com

Allied Telesis SwitchBlade x3112 User Manual

Page 106

background image

Chapter 4: Installing the Power Supplies

106

7. Lower the locking handle of the power supply module to secure the

module in the slot, as shown in Figure 61.

Figure 61. Locking the Handle on the AT-SBxPWRPOE1 AC Power

Supply

8. To install a second AT-SBxPWRPOE1 AC Power Supply, repeat this

procedure.

9. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter

5, “Installing the AT-SBx31CFC Card and Ethernet Line Cards” on
page 113.

Note

Retain the tie wrap that comes with the power supply. You will use it
to secure the power cord to the chassis when you power on the unit
in “Powering on the AT-SBxPWRPOE1 AC Power Supply” on
page 158.