beautypg.com

Allied Telesis SwitchBlade x3112 User Manual

Page 99

background image

SwitchBlade x3112 Installation Guide

99

Figure 53. Inserting the AT-SBxPWRSYS1 AC Power Supply

7. Lower the power supply locking handle to secure the power supply to

the chassis, as shown in Figure 54 on page 100.