Section ii, Installing the chassis, Section ii: installing the chassis – Allied Telesis AT-SBx81CFC960 User Manual
Page 79

79
Section II
Installing the Chassis
This section contains the following chapters:
Chapter 4, “Safety Precautions and Site Requirements” on page 81
Chapter 5, “Installing the Chassis in an Equipment Rack” on page 89
Chapter 6, “Installing the Power Supplies” on page 105
Chapter 7, “Installing the AT-SBx81CFC960 Control Card and Ethernet
Line Cards” on page 125
Chapter 8, “Installing the Transceivers and Cabling the Ports” on page
141
Chapter 9, “Powering On the Chassis” on page 169
Chapter 10, “Verifying the Hardware Operations of the Chassis” on
page 207
Chapter 11, “Troubleshooting” on page 213
Chapter 12, “Replacing Modules” on page 229
Chapter 13, “Upgrading the Controller Fabric Card” on page 259
This manual is related to the following products: