beautypg.com

Allied Telesis AT-SBx81CFC960 User Manual

Page 130

background image

Chapter 7: Installing the AT-SBx81CFC960 Control Card and Ethernet Line Cards

130

Section II: Installing the Chassis

Figure 68. Removing the Battery Insulator

5. Move the locking handles on the front panel to the open position, as

shown in Figure 69.

Figure 69. Opening the Locking Handles on the AT-SBx81CFC960

Controller Fabric Card

6. Align the edges of the AT-SBx81CFC960 Controller Fabric Card with

the internal chassis card guides in slot 5 or 6 of the AT-SBx8112
Chassis. Figure 70 on page 131 shows the AT-SBx81CFC960 Card
aligned in slot 5.

This manual is related to the following products: